• <fieldset id="m8wm2"><pre id="m8wm2"></pre></fieldset>
  • <center id="m8wm2"></center>
  • Beijing-Shanghai High Speed Railway
    Author: ? ?   Time:2012-04-22  Clicks:    
    【Font:Big middle small



    Beijing-Shanghai High Speed Railway has a full length of 1,318km, open to traffic on June 30, 2011. SIYUAN has undertaken the survey & design works of 643km from Xuzhou to Shanghai.?

    Beijing-Shanghai Railway is a high speed railway with the longest one-time construction length and the highest standard across the world, and also a construction project with the biggest one-time investment since founding of the People’s Republic of China.

    SIYUAN was responsible for the section Xuzhou~Shanghai, which starts from Suzhou, Bengbu, and Chuzhou in Anhui Province, via Xuzhou, Nanjing, Zhenjing, Changzhou, Wuxi and Suzhou in Jiangsu Province, and ends at Shanghai. There’re altogether 21 stations along the entire line of Beijing-Shanghai High Speed Railway, 12 of them are located at section Xuzhou-Shanghai including Xuzhou East Station, Suzhou East Station, Bengbu South Station, Dingyuan Station, Chuzhou South Station, Nanjing South Station, Zhenjiang West Station, Changzhou North Station, Wuxi East Station, Suzhou North Station, Kunshan South Station, and Hongqiao Station.

    As a participant for the construction of Beijing-Shanghai High Speed Railway, centered on the five high-speed railway target of “quality product, technical innovation, environmental friendly, energy saving, and social harmony”, SIYUAN survey & design staff have carried out technical researches and design proposal studies to tackle some key problems, including ensuring the high smoothness of infrastructures by adopting rational alignment and engineering proposals, getting soft foundation settlement under control via measures such as enhancing geological investigation and adopting reasonable pile foundation arrangement, etc., and conquering the difficulties of crossings of high-speed railway with highway and navigable waterway by means of large-span continuous beam and large-span basket handle arch, etc..

    In order to make Beijing-Shanghai High Speed Railway a model for green transportation development, SIYUAN has been attaching equal importance to the environmental protection, water-soil conservation and quality operation after completion: first, avoid or bypass historical site, scenic spots, and environmentally sensitive points during the process of route selection; second, adopt the most feasible and effective technical proposals in terms of type selection of works among bridge, roadbed, and tunnel, so as to avoid environmental damages due to soil-water losses out of high filling and low cutting; there, adopt greening engineering design and drainage system design; four, combine permanent works with temporary works as far as possible by reducing temporary land use and strengthening reclamation design of temporary works; five, adopt vibration and noise reduction measures, such as adoption of over-section continuous welded rail (seamless rail), high standard rail track smoothness, acoustic board, TMD (tuned mass damper), acoustic ceiling, sound barrier, sound insulation window, and so on; six, river bank protection and flood control works designs, such as river bank reinforcement, revetment, and river beach cutting designs for up to a hundred rivers including Huaihong New River, Huaihe River, Wangyuhe River, Runzaobing River, Wusongjing River, etc..

    久久国产精品99国产精| 久久亚洲私人国产精品vA| 99精品久久久久久久婷婷| 久久成人永久免费播放| 久久婷婷五月综合色奶水99啪| 亚洲国产精品无码成人片久久| 久久久精品国产Sm最大网站| 亚洲va国产va天堂va久久| 国产精品久久午夜夜伦鲁鲁| 7777久久久国产精品消防器材| 亚洲国产成人久久精品动漫| 亚洲精品美女久久久久99小说| 久久精品国产只有精品66 | 麻豆一区二区99久久久久| 久久久久国产精品| 久久棈精品久久久久久噜噜| 国产一区二区精品久久岳| 中文无码久久精品| 日韩十八禁一区二区久久| 久久伊人亚洲AV无码网站| 国产精品日韩欧美久久综合| 久久99中文字幕久久| 97久久香蕉国产线看观看| 久久一日本道色综合久久| 日韩va亚洲va欧美va久久| 亚洲一区二区三区日本久久九| 伊人久久大香线焦AV综合影院| 久久综合九色综合久99| 久久亚洲国产精品一区二区| 精品国产乱码久久久久久1区2区| 久久精品国产清自在天天线| 人妻丰满AV无码久久不卡| 亚洲欧美一区二区三区久久| 伊人久久大香线蕉综合网站| 久久av免费天堂小草播放| 国产午夜福利精品久久| 93精91精品国产综合久久香蕉 | 国产成人精品综合久久久| 日韩亚洲国产综合久久久| 久久人人爽人人爽AV片| 亚洲国产日韩欧美久久|